From renovations to new developments, New England Engineering has successfully completed a project like yours. Let our years of engineering experience guide you through your next project.

Industrial




Saint Gobain Container’s Inc
Milford, MA

100,000+ SF
M & ACOUSTICS
  • Lead Mechanical, and Acoustics Engineer.
  • Completed design for acoustical enclosures and site acoustical analysis of new oxygen plant.
  • Completed design of new oxygen plant distribution piping to main production building.
Saint Gobain Container’s Inc.
Dunkirk, IN

100,000+ SF
E

  • Lead Electrical Engineer.
  • Designed 69,000 Volt sub-station capacity and size expansion for the new 15,000,000 VA transformer to upgrade factories production facilities. 
Saint Gobain Container’s Inc.
Milford, MA

10,000+ SF
MEPFP

 


  • Lead Mechanical, Electrical, Plumbing & Fire Protection Engineers.
  • Completed design for upgrading existing air compressor plant with new 10,000 Horsepower air compressors used for the manufacture of glass bottles in air compressor building addition. Extended 4.16kV power distribution to new equipment and added outdoor cooling tower for waste heat removal, along with upgrading the plants 100psig and 60psig compressed air distribution. 

 

Saint Gobain Container’s Inc.
Milford, MA

100,000+ SF
MEPFP

 

 


  • Lead Plumbing & Fire Protection Engineers.
  • Completed code review for rebuilding the furnace 15 rebuild 50MMBH pure oxygen fed natural gas molten-glass furnace 15.
  • Completed designed for pure oxygen stainless steel piping from air to oxygen extraction plant to furnace 15 and integrated oxygen control skid to burners, including all oxygen stainless steel piping distribution. Pure oxygen is used to meet MA EPA Emission Controls.
  • Completed design for 32psi dual service natural gas piping from site pressure reducing station to furnace 15 natural gas control skid, and then to individual furnace 15 burners.

 

ARDAGH Glass, Inc.
Milford, MA

100,000+ SF
EPI&C

 

 


  • Lead Plumbing, Electrical, Instrumentation & Controls Engineers.
  • Completed code review report for rebuilding the furnace 16 50MMBH regenerative combustion air and natural gas molten-glass Furnace 16.
  • Completed Design of 32psi dual service natural gas piping from site pressure reducing station to furnace 16 natural gas control skid, fore hearth burner skid, and then to individual furnace 16 burners.
  • Completed design of combustion air to fore heart burner skid, and combination combustion air/natural gas piping for fore hearth molten glass distribution burners leading to compressed air glass bottle forming machines run by compressed air.

 

AZZ High Voltage Bus Systems
Medway, MA

80,000+ SF
MEPFP
  • Lead Mechanical, Electrical, Plumbing, and Fire Protection Engineer
  • Completed design for industrial and high voltage bus systems manufacturing building.
300 VFW Drive
Rockland, MA

11,000+ SF
MEPFP

  • Lead Mechanical, Electrical, Plumbing, and Fire Protection Engineer
  • Completed design for industrial warehouse/office facility